Initial check
Axiterm checks whether the submitted project notes are enough for an engineering review.
Engineering RFQ
Leave your contact and a short note. Axiterm can follow up by email or WhatsApp for drawings, quantities, material, finish, and project details.
Best RFQ Inputs
Drawing, sample photo, or reference part
Equipment application and mating interface
Material, finish, plating, and insulation requirements
Quantity range, sample need, and repeat order expectation
No finished drawing yet? A dimensioned sketch, clear sample photos, or a reference part is enough to start review.
After Submission
Axiterm checks whether the submitted project notes are enough for an engineering review.
If dimensions, finish zones, mating parts, or quantity assumptions are missing, follow-up questions are sent before quoting.
The response should identify open risks, sample path, MOQ and lead-time assumptions, and the next approval basis.
Useful RFQ Evidence
A useful RFQ connects the product target, drawing basis, material or finish route, inspection plan, and release evidence.
Drawing, sample parts, material and finish references, inspection tools, and packaging inputs.
Reference sample, mating interface, equipment fit, or approved product structure.
Material grade, plating target, color references, insulation needs, and finish zones.
Before You Send